11-16-2017

Parsons Design-Build JV Wins Silicon Valley Clean Water Project

PASADENA, CA (November 16, 2017) – Parsons—in a design-build joint venture—will design and construct the Silicon Valley Clean Water’s (SVCW’s) Front of Plant project in Redwood City, CA. This project is part of SVCW’s Regional Environmental Sewer Conveyance Upgrade Program, which incorporates conveyance system improvements to transport wastewater from member agencies to the SVCW wastewater treatment plant.

The Front of Plant project is a major component of the SVCW conveyance system and includes the receiving lift station, which lifts the wastewater from the gravity pipeline to the surface to be screened and de-gritted before flowing to the treatment plant in the new influent connector pipe. Parsons’ work will also include electrical, civil, and odor-control facilities.

“We’re honored to bring our extensive experience in water and wastewater systems to this important project in the Silicon Valley,” said Donald Graul, President of Parsons Construction Group. “Using SVCW’s state-of-the-art biological treatment technology to recycle wastewater makes clean water available for reuse and protects the San Francisco Bay ecosystem.”

Parsons is a technology-driven engineering services firm with more than 70 years of experience in the engineering, construction, technical, and professional services industries. The corporation is a leader in many diversified markets with a focus on infrastructure, defense, security, and construction. Parsons delivers design/design-build, program/construction management, systems design/engineering, cyber/converged security, and other professional services packaged in innovative alternative delivery methods to federal, regional, and local government agencies, as well as to private industrial customers worldwide. For more about Parsons, please visit www.parsons.com, and follow us on Facebook, Twitter, LinkedIn, and YouTube.
© 2017 Parsons Corporation. All rights reserved.
Back to top