- ...and cumbersome, resulting in delayed delivery of critical capabilities and increases costs. The complexity and interdependency of modern defense systems require a more integrated and holistic approach to design, development, verification,...
- ...flow forecasts, feasibility studies, preliminary design, tender preparation, program management for the detailed design consultants and design-build contractors, and construction supervision of the primary tunnels and terminal pumping stations. We...
- ...were proposed. During the bid phase of this Design-Build Project, the orthotropic deck was found to be more expensive and challenging to design, fabricate, and construct than a traditional concrete...
- ...and the mainstreet businesses and institutions. Our Leadership Role As the lead design engineers, we exhibited our urban street design expertise by completing the community planning and functional design process...
- ...C Cost Estimates Public and stakeholder engagement Preliminary and Detailed Design Tender package preparation Contract administration, inspection, and engineering services during construction Trail Design Wayfinding Design Highway Design Parking Lot...
- ...Igor M., Design Manager DESIGN OWNER WHO DEMONSTRATES EXCELLENCE. Igor demonstrates excellence not only as a project lead but also as a design owner. As the infrastructure design manager and...
- ...coordinated all utility relocations and prepared all cost estimates, specifications, and designs of roadways, surface drainage, sewerage, bridges, and all traffic-related disciplines including lighting, striping, signs, signals, and CCTV. Post-design...
- ...In this design-build team, we were a minor (33%) equity member in the integrated construction joint venture and served as lead designer. The project included: Design, construction, and commissioning of...
- ...iconic look and level boarding Streetscape/landscape design to enhance the entire corridor BRT naming/branding for Colfax and all subsequent Denver-area BRT corridors Achieving Success In Denver The final design phase...
- ...(CM/GC) project delivery process for the U.S. Highway 53 bridge that crosses the decommissioned Rouchleau mining pit in Minnesota. As the bridge designer, Parsons completed the preliminary design within 30...