Client: Current Contract Value: Constructed Project Value: Project Duration: Services Provided:
|
The metropolitan Bakersfield area is located in the eastern portion of the southern San Joaquin Valley in central California, about 120 miles north of downtown Los Angeles. Bakersfield has been one of the fastest growing cities in California for many years, and it had a Year 2000 census of 246,889. Bakersfield expects that its population will continue to grow between 2% and 3% a year, resulting in a projected Year 2025 population increase to 507,500. Wastewater flows are expected to increase proportionally in Bakersfield’s service area.
Bakersfield currently owns and operates two wastewater treatment and disposal facilities. Wastewater Treatment Plant 2, serving the eastern half of the city, was expanded recently and has adequate capacity. However, Wastewater Treatment Plant 3, serving the western half, has not been upgraded in more than 10 years and has reached capacity.
Plant 3’s existing facilities provide treatment capabilities for both liquid and solid streams with an average daily flow capacity of 16 million gallons per day (mgd). At present, the liquid stream treatment facilities consist of one headworks, four primary clarifiers, four trickling filters, four secondary clarifiers, one overflow/equalization lagoon, and four storage reservoirs. For most of the year, the treated effluent is transported through an 8.5-mi-long, outfall line to Los Angeles’ Green Acres Farm, west of Interstate 5. During periods of wet weather, Plant 3 temporarily stores excess effluent that cannot be accepted by the farm. The solid stream treatment facilities consist of four primary and three secondary sludge pumps, six anaerobic digesters, and 24 sludge-drying beds. Trucks haul the dried sludge to the city-owned farm associated with Plant 2, where it is applied to the soil as a fertilizer supplement. In response to Bakersfield’s need to upgrade and expand Plant 3 (because of the increasing wastewater flow and more stringent regulatory requirements), the city hired Parsons in 2004 to prepare a master plan for the plant expansion and then design the necessary facilities. In the master plan, Parsons evaluated several expansion scenarios and ultimately recommended that the size of Plant 3 be doubled to provide a total wastewater treatment capacity of 32 mgd. Parsons also recommended that a new activated-sludge biological treatment process replace the existing trickling filters and that all other existing treatment facilities be upgraded and/or expanded. From a future total flow of 32 mgd, an anticipated 14-mgd secondary effluent will continue to flow to the Green Acres Farm and 16 mgd will be percolated onsite. The remaining 2 mgd will receive tertiary treatment (in accordance with California Title 22 standards) to be reused locally for in-plant use and landscape/turf irrigation. In April 2007, Parsons completed the design for the Wastewater Treatment Plant 3–2007 Expansion, providing more than 800 drawings and thousands of pages of specifications. After a 4-month, bid-and-award period, a notice to proceed was issued on September 17 to the successful construction contractor. In accordance with established city procedures, a separate firm was hired as construction manager for the project. Parsons will continue to provide engineering services during construction.
The upgraded and expanded Plant 3 will include the following constructed facilities:
Bakersfield is using the Plant 3–2007 Expansion project to spearhead two other improvements immediately adjacent to the plant. For the first project, Parsons is providing a design that will upgrade the four roads surrounding Plant 3 into arterial streets for the city. These arterials will have three lanes of traffic in each direction, enhanced signalized intersections, and landscaped medians. For the second improvement, a large portion of the processed plant effluent will be reclaimed to irrigate the Bakersfield Sports Village—an ambitious project currently in the planning phase that will create a family-oriented recreation and retail environment for the entire community. When completed, the Wastewater Treatment Plant 3–2007 Expansion will represent the largest public works project in Bakersfield’s history. At project completion, Bakersfield will have created a positive community legacy for generations to come. Parsons is providing the expertise to realize this goal.
|
||||||||||
|